Locking of the connectors will be done through pneumatic cylinder
Circuit pick up chutes will be open automatically with the help of pneumatic cylinder based on the input from program to access the circuit.
Where to insert – LED light guide provision will be given nearer to module cavity
Once the picked circuit is inserted according to the LED light guide, the right cavity will be ensured by probe which is placed inside the connector module.
After ensuring the right insertion, system allows to move for next cavity.
Push pull operation will be done manually to ensure that the terminal is locked properly with the connector’s latch.
If any wrong insertion or wrong sequence, the connector will be locked in side the cavity and tower lamp will give alarm for escalation.